Saturday, May 10, 2008

It's starting to take shape...

Here's Lance cutting out the Jacuzzi tub surround. We finished building the supports. It's cool to see the space filling up and becoming defined areas versus empty space.
Here's the tile in the floor of the shower, we decided to cut our 18x18 travertine into 4x4 squares for the floor.
This is how we will do the edge.
So tomorrow we hope to get it set in mortar and then off to spend mother's day with our moms!

Wednesday, May 7, 2008

Custom Shower

Last Friday Lance and I decided to do tile instead of a custom concrete floor and shower. I found 18x18 Travertine on clearance at Home Depot for a screamin' deal so we decided that is what we would use. The only catch being that the Home Depot here in the valley did not have enough to complete our bathroom floor, shower and jacuzzi tub surround. In true Lance and Amber style we ended up driving to Corvallis to get what we needed. We left at about 5pm, arrived in Corvallis around 8:30 and arrived home about 1:30am. Did I mention we took my beamer and the total weight of the tile we needed was about 600 pounds?!
Ya well, it was worth it!
That was Saturday, Sunday we were pooped so luckily my dad came over to help Lance and my mom came over to help me run errands and stay sane! I was, well let's just say in a "mood"... nothing was going my way and did I mention I was REALLY TIRED LOL!!!
Here's my dad helping Lance with the first layer.
So custom size and layout for a shower = you "get to" pour your own basin and make sure it has the right layers and pitch so the water goes down the drain and doesn't puddle. Below is the first layer of mortar. Below that is metal lath and tar paper as a barrier and of course the wood base board.
Next layer is a rubber membrane. Once I found someone to help me find it at Lowes, the rest of this layer wasn't so hard. Lance did this tonight, it's Wednesday.
Here's Lance making sure the pitch is correct on our final layer which is also mortar.
We even got some of the backer board hung and hope to get to tile this weekend!
That's all for tonight, hopefully we'll make good progress this weekend and get a normal amount of sleep!


Monday, April 28, 2008

It's been a LONG weekend!

View to the left of the door where the
Jacuzzi tub will be...
View to the middle, you can see we framed in the potty room! To the right is where the custom over sized shower will be built.
For this view you will need to imagine a vanity in place of the pile of tools on the right wall near the door.
So this weekend we finished plumbing (THANK GOD!), we re-installed the floor and framed in the potty room all in three days time! If you scroll down past Lance's birthday photos, you can see what the room looked like Friday night before we started this weekends madness!!

Saturday, April 26, 2008

Lance's Birthday

I realize I am out of order but here are photos of Lance's birthday from Wednesday the 23rd.
Joy made the cake... man it was good!!!Here's Chef Lance preparing the bacon wrapped tri-tip steak!
Mmmm I'm getting hungry all over again.

Opening presents. I got him a new air hose, it was the wrong one of course :)
The family and friends singing Happy Birthday!
All in all it was a good evening!
I'll post some more house progress soon!

Friday, April 25, 2008

Progress Update for Friday Night

We've made quite a mess tearing down sheet rock and ripping up the floor. Lance has his work cut out for him! Plumbing, oh the joy!Here's the room now that I loaded up all the trash. Yes you can see the dirt under our house! Lance was working on a test wall with some new concrete that is made to go vertical!
That's all for now but we took Monday off work to have 3 full days to work on it. I'll try to update again tomorrow!

Monday, April 21, 2008

Sunday's Progress

Today Lance's dad Bill, came over to help for a while.We cut out the sheet rock that will be in the bathroom so we can replace it with green board.
This is the wall all framed that will separate the bathroom and closet.
Hi Morial!
Here's the wall sheet rocked!

Wednesday is Lance's birthday so I am not sure how much we will get done before the weekend but I'll keep you posted!

Saturday, April 19, 2008

We're at it again...

Here is our Master Bedroom pre-appraisal 2005. That door goes to the small bathroom and yes, the plant is sitting in a drinking fountain.Here is the same view of our Master Bedroom a few days ago.
Let the demolition begin... You'll notice the wall missing. Look again at the picture before, the closet hasn't moved... We are opening it up for the Master Bathroom! Gotta love the trash heap... going to the dump is always such a pleasure. LOL!
So this side will be the Master walk-in Closet!!
WOO HOO!!!
You can see the frame to the pocket door,
we are trying to save space.
And this side will be the Master Bathroom, we have more than doubled the size of the bathroom so we can have a Jacuzzi tub, over sized 2-person corner shower, a single sink antique hardwood style vanity we bought at Costco almost 4 years ago (yes this August marks 4 years for us in this house) and we will also have a built in linen closet. We also plan to have a separate room built in for the toilet, little privacy is always good!

That's all for now, I'll keep you posted!!