Wednesday, April 25, 2007

The Main bathroom Remodel

So we pretty much had to gut the whole room and start over. We removed the sink and cabinet and the toilet and replaced it all! We also torn down all the old sheet rock walls and installed greenboard (sheetrock for bathrooms) and tile backerboard for the shower area.
The only way to get the tub into the bathroom was to cut a whole in our kitchen wall and slide it through... we then had to replace that whole wall because the texture would have been impossible to match without it looking "patched".
This is a pocket we put in the wall to inset the towel rack behind the door so the door does not hit it every time you open it.
Here's a finished look at our bathroom, it's small so it was hard to get a good picture. We finished this in September 2006.

2 comments:

Brooke - in Oregon said...

Talk about an amazing transformation!! Huge difference in this one little room, love the 'photo' on the wall too :)

The Clarks said...

I never got to see the finished look of that bathroom - I love it! I always look forward to your new pictures since I can't just come over and see the progress anymore :(